in Obertshausen

Alpha Industrial

Alpha Industrial in Obertshausen2

Obertshausen

Location

11,000 sqm

Floor area

126 / 90 / 9.5 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

July 13 – Feb. 14

Period of construction
Description of the facility

The building consists of a logistics building with a total of four frontal office extensions, two on each longitudinal side of the hall. The logistics hall is divided into two same-size sections by a fire wall. The entire structure of the building consists of BREMER precast reinforced concrete elements with a trapezoidal sheet roof and facade cladding comprised of horizontal insulated steel elements. The base of the facade consists of reinforced concrete sandwich elements.

Special features

This is the first BREMER construction project for Alpha Industrial