in Bad Fallingbostel
bauwo logistics centre
Bad Fallingbostel
22,600 sqm
228 / 85 / 12.50
Logistics building
Turnkey
Sept. 2019 – Sept. 2020
BREMER builds a logistics centre for bauwo in Bad Fallingbostel.
Separated by fire walls into two units, the logistics centre has a mezzanine space at the front site, 9 sectional doors per unit as well as a swap trailer and a ground level door for delivery.
The office levels contain modern workplaces, social areas and break rooms.
A car park for 79 cars and 7 motor trucks is planned outside, as wells as roofed parking lots for bicycles. Further outdoor installations and french drains are being extended by requirement.
All construction phases are carried out during ongoing operation.
The logistics centre receives the certificate Silver by the German Sustainable Building Council (DGNB - Deutsche Gesellschaft für Nachhaltiges Bauen e.V.).