in Rheinberg

Goodman

Goodman in Rheinberg5

Rheinberg

Location

12,000 sqm

Floor area

139 / 85 / 13.95 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

Feb. 2015 – July 2015

Period of construction
Description of the facility

The warehouse building incorporates an approx. 8,000 sq m dry storage facility with empties area as well as two deep-freeze and cold storage zones, each with an approximate area of 2,000 sq m. The building is divided into two fire compartments. The cold storage area additionally features so-called "chicken boxes" tailored to the specific requirements of the customer supplied. Adjoining the handling hall at the front of the complex are 18 loading bays. Also planned for this area is a two-storey administrative and social building with a gross floor area of approx. 440 sq m. The entire project including exterior facilities and refrigeration equipment is executed by BREMER AG as a turnkey contract.

Special features

Flexible deep-freeze, cold and dry storage facilities. A multifunctional logistics building with integrated cold and deep-freeze storage areas. The finished building will be awarded a silver DGNB certificate.