in Dornstadt

Good­man WMF exten­sion

Goodman WMF extension in Dornstadt5

Dornstadt

Location

20,765 sqm

Floor area

151 / 121 / 14 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

Jan. 2015 – Oct. 2015

Period of construction
Description of the facility

One axis of the existing building is upgraded to a fire wall. To raise the building to the required level, approx. 65,000 m³ of earth needs to be moved. The building is fronted by a two-storey office. The hall structure consists of precast reinforced concrete elements and features a change of roof level. An automated small parts store with a depth of 12 m and a floor area of 4,500 m³ is also realised on a mezzanine level.

Special features

Extension of the logistics building erected in 2011 with extensive earthworks.