in Gernsheim

green­field DSV logistics centre

greenfield DSV logistics centre in Gernsheim3

Gernsheim

Location

21,000 sqm

Floor area

216/96/12.50 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

Jan. 2014 – July 2014

Period of construction
Description of the facility

The building comprises three hall sections separated by fire walls. Goods handling takes place at 30 loading bays on the longitudinal side of the building. A special accent is set by the three-storey administrative building, which features a set-back top floor and a roof terrace.
 

 


   

 
 

 

Special features

ENVIRONMENTALLY SOUND AND ENERGY-EFFICIENT FOR SUSTAINABLE USE – The entire area of the logistics building in Gernsheim is fully sealed in line with the requirements of the Federal Water Act (WHG) and thus reliably prevents water pollution from operations involving substances that are hazardous to water. The complex is also equipped throughout with energy-saving long-life LED technology.