in Gernsheim
greenfield DSV logistics centre
Gernsheim
21,000 sqm
216/96/12.50 m
Logistics building
turnkey
Jan. 2014 – July 2014
The building comprises three hall sections separated by fire walls. Goods handling takes place at 30 loading bays on the longitudinal side of the building. A special accent is set by the three-storey administrative building, which features a set-back top floor and a roof terrace.
ENVIRONMENTALLY SOUND AND ENERGY-EFFICIENT FOR SUSTAINABLE USE – The entire area of the logistics building in Gernsheim is fully sealed in line with the requirements of the Federal Water Act (WHG) and thus reliably prevents water pollution from operations involving substances that are hazardous to water. The complex is also equipped throughout with energy-saving long-life LED technology.