in Mannheim

green­field indust­rial park

greenfield industrial park in Mannheim3

Mannheim

Location

24,047 sqm

Floor area

124 / 48 / 12.55 + 108 / 185/ 12.55 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

Oct. 2015 – April 2016

Period of construction
Description of the facility

The industrial park consists of 3 halls with a total area of 24,047 sq m. Halls 1 and 2 are separated by a fire wall, hall 3 is a free-standing structure. The individual halls are accessed via high-speed doors. Each hall has an adjoining 10 m wide canopy. The office area is accommodated in the adjacent old barracks building, which is accessed via a passageway from hall 1.