in Soltau

Harry-Brot

Harry-Brot in Soltau4

Soltau

Location

13,500 sqm

Floor area

136 / 90 / 11.75 m

Length/width/height

Logistics building

Type of building

turnkey

Scope of supply and services

Sep. 2016 - May 2017

Period of construction
Description of the facility

The building is constructed as an extension to an existing factory building. Parts of the extension are designed as a 2-storey structure. The project also includes a 2-storey interior office building. The building features 12 dock levellers and consists of 2 fire compartments.