in Nuremberg
PANALPINA logistics centre Nürnberg
Nuremberg
10,000 sqm (hall) / 7,768 sqm (office building 1+2)
100 / 91 / 14 (hall) . 59 / 14 / 26 (office 1). 36 / 25 / 12 (office 2)
Logistics building, Office buildings
turnkey
May 2007 - Aug. 2008
The office building consists of seven office floors as well as service and archive space on the ground floor. From the floor slab upwards, it is realised entirely in precast reinforced concrete elements. The facade consists of aluminium strip windows and fibre cement panels. The building is accessed by a central stairwell core with elevator. The warehouse is similarly realised in precast reinforced concrete elements, with a single row of interior columns. The facade consists partly of concrete sandwich elements, partly of a metal cassette facade. A 160-space multi-storey car park built using the patented BREMER system is situated in the outdoor area.
This 7-storey office building with warehouse and parking deck (160 spaces) is the second construction contract that BREMER SYSTEMBAU GmbH has realised for PANALPINA Welttransport GmbH. What is special about the building are the building services. Heating and cooling for the administrative building and ground heating for the warehouse are provided entirely by geothermal energy. The geothermal probes are sunk to depths up to around 75 m.