in Hanover

EN Neukirch Grundstücksverwaltung

EN Neukirch Grundstücksverwaltung in Hanover4

Hanover

Location

2,600 sqm

Floor area

49 / 40 / 10.0 m

Length/width/height

Production facilities

Type of building

turnkey

Scope of supply and services

Aug. 2015 – March 2016

Period of construction
Description of the facility

The production and warehouse building is divided into 2 sections and features two loading units and a large ground-level bay. The clear height is 7.5 metres. On the side facing the road is a 2 storey office annex with a small staff canteen.