in Achern

greenfield production facility

greenfield production facility in Achern5

Achern

Location

12,140 sqm

Floor area

108 / 105 / 12.45 + 15 / 55 / 12.45 m

Length/width/height

Production facilities

Type of building

turnkey

Scope of supply and services

Aug. 2015 – Feb. 2016

Period of construction
Description of the facility

The production facility consists of 3 production areas and a mezzanine with a total floor area of 8,175 sq m, an approx. 3,215 sq m storage area and a workshop, technical, office and social facility extension with an area of around 810 sq m. The different zones are separated by fire walls and system walls. The building consists of a reinforced concrete structure designed for 5 tonne crane track. Access to the individual hall sections is provided by high-speed doors. The facility is served by 8 loading bays. The office premises, with an impressive entrance area, are located on the ground floor.