in Kirchardt

SEBRO production facility

SEBRO production facility in Kirchardt9

Kirchardt

Location

5,527 sqm

Floor area

81 / 102 / 10.50 m

Length/width/height

Production facilities

Type of building

turnkey

Scope of supply and services

March 2017 - Dec. 2017

Period of construction
Description of the facility

The new building consists of two adjoining production halls and a 2-storey office building as a head-end structure to hall 1. The office facility and the production hall are separated by a fire wall. The buildings stand on deep foundations laid to a depth of up to approx. 10 m. The production halls are equipped with a total of 3 high-speed spiral doors. The office building incorporates a lift with disabled access. The production halls have a vertical insulated facade, the office building a facade with a composite thermal insulation system. Heating for the halls is provided by radiant tube heaters, while the office building heating is handled by a heat pump and gas-fired condensing boiler.

Special features

Demolition of an existing hall and construction of a new production hall with office building.